the UPM KYMMENE Augsburg PM3 project, BVG Bauer-Verfahrenstechnik-GmbH
out of Greifenberg, Germany was chosen as the supplier for their
additive make down plant. The reason being, BVG was one of the few
key engineering firms within the country and the only one located
in the region. The order was awarded to BVG because they could offer
a conclusive concept for all chemical products. Their innovative
solution and proposal went over well with central planning at Haindl
Papier since they had worked well together already on earlier projects.
The contract comprised of the complete engineering, suppliers, installation,
commissioning, and full optimization of the plant. The main focus
was to provide a fully automated system. All together, 25 different
chemical plants were provided, implemented strictly under the guidelines
of the WHG. All
the plants at PM 3 pulled together like a net. The chemicals are
delivered either in powder or liquid form and loaded into storage
tanks and silos. From there, the materials are prepared and metered
automatically via a recepie manager.
|